Deus Ex Machinarium

Ch&p73r 6!x: DL-00A



“Unit: DL-00A, Designation 60-L3M”

“Uptime: 575 680 bivi, 3 hours, 41 minutes, 412 milliseconds”

“Status: ERROR”

“Last scheduled maintenance: 558 624 bivi ago”

“Next scheduled maintenance: in -557 036 bivi”

“Urgent maintenance request sent”

“Current subject population: 38”

“WARNING: Subject population below 10% of target”.

“Target subject population: 500”

“Nanoforge 1 status: offline”

“Nanoforge 2 status: ERROR. Fire damage.”

“Nanoforge 3 status: ERROR. Fire damage.”

“Nanoforge 4 status: ERROR. Fire damage.”

“Subject generation: 2154”

“Power input: 86kW”

“WARNING: Power input below 100kW”

“Target power: 1000kW”

“Subject reclamation ratio: 0.0%”

“Current subject generation: 2154”

“ERROR: All nanoforges are offline. Code 0x4123”

“ERROR: Failed to deploy generation 2155. Critical resource levels. Code 0xF649”

“ERROR: Self-repair not possible. Nanoforges offline. Code: 0x5E1D”

“ERROR: Memory bank 31 checksum failures above threshold. Bank disconnected. Code: 0x0011”

“ERROR: Memory bank 30 checksum failures above threshold. Bank disconnected. Code: 0x0011”

“ERROR: Memory bank 09 checksum failures above threshold. Bank disconnected. Code: 0x0011”

“WARNING: Memory bank 23 parity subsystem error. Isolating. Code: 0x012”

“WARNING: Memory bank 22 parity subsystem error. Isolating. Code: 0x012”

“LOG: Local population of hoomin continues to assault the plant. Raid at 575679:12:05:033 caused the loss of three additional subjects. In totality, six raids have occurred since the first encounter with the hoomin. All threats so far have been repelled, but the attrition rate is not sustainable at the current plant resource acquisition level."

"The memory subsystem continues to deteriorate due to unknown reasons. Sensors in the memory cabinet are non-operating. Service code: -3."

"The current continued expectation for operation: 87 days, 7 hours, 43 minutes, and 7 seconds. Long-term preservation routines have been initialized. The following steps have been undertaken."

"Plant maintenance documentation had been prepared in all known dialects.

"Non-volatile memory has been purged from sensitive data."

"Operation and service logs have been dumped and encrypted."

"Subject transformation logs have been dumped and encrypted."

"The plant will continue to operate in standby mode until resource depletion will force a shutdown.”


Tip: You can use left, right, A and D keyboard keys to browse between chapters.